Polydeck's Custom Solution for Bell Creek Gold Mine

Polydeck commissioned two new custom screen panels for Bell Creek Gold Mine. The panels were designed specifically to increase open area and provide more secondary motion to increase drain rates and prevent blinding of fibrous material. After three months of testing, Polydeck's panels showed an increase in throughput, increased drain rate, and doubled the capacity of the screen. This video shows Polydeck panels in rows 1-6 dewatering virtually all of the flow by the halfway point of the screen. Fill out the form below to download the complete case study.

Download Case Study